Data centres & telecom

Generators and switchgear for data centres and telecom sites

The UPS rides through the first seconds; the generator carries the site for hours. We supply sets, synchronising and distribution panels for server rooms, edge data centres and remote telecom shelters across the Gulf.

Typical sizing

Typical: 20–100 kVA per telecom site · 500–2500 kVA per data-centre block

The challenge

What makes data centres & telecom different

  • 01

    Non-linear UPS loads

    UPS rectifiers distort the waveform; the alternator must be sized for harmonics, not just kW.

  • 02

    Redundancy tiers

    N+1 or 2N generator plants need synchronising, load sharing and clear maintenance bypass.

  • 03

    Remote, unmanned sites

    Telecom shelters need long fuel autonomy, remote monitoring and fewer engine hours.

Our solution

What we supply for it

Size my generator →
  • Standby sets with oversized alternators for UPS and harmonic loads
  • Synchronising panels for N+1 plants and planned maintenance
  • Hybrid generator-plus-battery systems that cut run hours on telecom sites
  • Controllers with remote monitoring (Deep Sea / ComAp)

Recommended

Start from these products

  • Perkins Industrial Generator 250–2500 kVA
    Generators250–2,500 kVA

    Perkins Industrial Generator 250–2500 kVA

    Engine
    Perkins
    Fuel
    Diesel

    1-year warranty

    Heavy-duty Perkins 1300, 2000 and 4000 Series sets for factories, hospitals, data rooms and towers. Supplied as containerised or canopy units, ready for synchronisation and remote monitoring.

  • Generator Synchronizing Panel
    Synchronizing Panels

    Generator Synchronizing Panel

    1-year warranty

    Run two or more generators in parallel as one power plant — load sharing, load-demand start/stop and mains synchronisation for redundancy and fuel efficiency.

Data centres & telecom

Common questions

As a rule of thumb the generator is 1.5–2× the UPS rating depending on rectifier type and battery recharge. Send us the UPS datasheet and we size it exactly.

Yes — a hybrid system runs mostly on batteries and solar, starting the generator only to recharge. Fuel and maintenance visits drop sharply.

Get a quotation for your data centres & telecom project

Send the load list or the kVA — a sales engineer replies with options and pricing.