Hybrid Generator + Battery System 20–200 kVA
- Fuel
- Hybrid
1-year warranty
Diesel generator paired with a lithium battery bank and smart controller. The engine only runs when needed, cutting fuel use and maintenance on low- or variable-load sites.

GenerationFZCPower solutions
for a reliable tomorrow
Data centres & telecom
The UPS rides through the first seconds; the generator carries the site for hours. We supply sets, synchronising and distribution panels for server rooms, edge data centres and remote telecom shelters across the Gulf.
Typical sizing
Typical: 20–100 kVA per telecom site · 500–2500 kVA per data-centre block
The challenge
UPS rectifiers distort the waveform; the alternator must be sized for harmonics, not just kW.
N+1 or 2N generator plants need synchronising, load sharing and clear maintenance bypass.
Telecom shelters need long fuel autonomy, remote monitoring and fewer engine hours.
Our solution
Recommended

1-year warranty
Diesel generator paired with a lithium battery bank and smart controller. The engine only runs when needed, cutting fuel use and maintenance on low- or variable-load sites.

1-year warranty
Heavy-duty Perkins 1300, 2000 and 4000 Series sets for factories, hospitals, data rooms and towers. Supplied as containerised or canopy units, ready for synchronisation and remote monitoring.

1-year warranty
Run two or more generators in parallel as one power plant — load sharing, load-demand start/stop and mains synchronisation for redundancy and fuel efficiency.
Data centres & telecom
As a rule of thumb the generator is 1.5–2× the UPS rating depending on rectifier type and battery recharge. Send us the UPS datasheet and we size it exactly.
Yes — a hybrid system runs mostly on batteries and solar, starting the generator only to recharge. Fuel and maintenance visits drop sharply.
Send the load list or the kVA — a sales engineer replies with options and pricing.